Improve Productivity by Reduce Stock Amount Spare Part through Hybrid Method ABC Classification & Pull System (Just in Time) in Electronics Manufacturing Industry
Citation
MLA Style :Mohammad Rofiudin, Slamet Riyadi, HumirasHardi Purba "Improve Productivity by Reduce Stock Amount Spare Part through Hybrid Method ABC Classification & Pull System (Just in Time) in Electronics Manufacturing Industry" International Journal of Recent Engineering Science 5.3(2018):8-11.
APA Style :Mohammad Rofiudin, Slamet Riyadi, HumirasHardi Purba, Improve Productivity by Reduce Stock Amount Spare Part through Hybrid Method ABC Classification & Pull System (Just in Time) in Electronics Manufacturing Industry. International Journal of Recent Engineering Science, 5(3),8-11.
Abstract
To achieve this required a smooth production process supported by good spare part inventory management. The purpose of this study is to determine the effect of collaboration Hybrid Methods ABC Classification and pull system to reduce the cost of inventory spare parts in the electronics manufacturing industry. This article indicates that the positive effect of the combination of both methods, the inventory cost can be reduced by 5%; eventually, productivity can be increased due to waste inventory can be minimized.
Reference
[1] Jati, W. R. (2012). Economic Dilemma: Traditional Markets versus Liberalization of Retail Business in Indonesia. Journal of Economics and Development Studies, 4(2), 223-242.
[2] Ghosh, B., Kumuthadevi, K., &Jublee, D. (2016). Linkage among competitiveness, competitive advantage and competitive priority of apparel export firms at Tirupur. International Journal of Management Research and Reviews, 6(8), 1012.
[3] Herlambang, R. D. (2016). [Theses] Inventory control analysis to minimize the cost of inventory of dry fabric raw materials in cv. Ssr industries bandung (Doctoral dissertation, FakultasEkonomiUnpas Bandung).
[4] Lin, B., Wang, J., Wang, H., Wang, Z., Li, J., Lin, R., ...& Wu, J. (2017). Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains. PloS one, 12(5), e0176961.
[5] Khajavi, S. H., Partanen, J., &Holmström, J. (2014). Additive manufacturing in the spare parts supply chain. Computers in industry, 65(1), 50-63.
[6] Thanki, S. J., & Thakkar, J. (2011). Lean Manufacturing: Issues and Perspectives. Productivity, 52(1), 12.
[7] Louit, D., Pascual, R., Banjevic, D., & Jardine, A. K. (2011). Optimization models for critical spare parts inventories—a reliability approach. Journal of the Operational Research Society, 62(6), 992-1004.
[8] Sirgy, M. J. (2002). Measuring corporate performance by building on the stakeholders` model of business ethics. Journal of business ethics, 35(3), 143-162.
[9] Walker, J. S., & Sanders, B. (2011). The community supports for wraparound Inventory: An assessment of the implementation context for wraparound. Journal of Child and Family Studies, 20(6), 747-757.
[10] Jonsson, P., &Mattsson, S. A. (2016). Advanced material planning performance: a contextual examination and research agenda. International Journal of Physical Distribution & Logistics Management, 46(9), 836-858.
[11] Hawkins, T. G., Nissen, M. E., & Rendon, R. G. (2014). Leveraging strategic sourcing and knowledge management to improve the acquisition of knowledge-based services. Journal of Public Procurement, 14(2), 215-251..
[12] Rivera-Gómez, H., Montaño-Arango, O., Corona-Armenta, J. R., Garnica-González, J., Hernández-Gress, E. S., &Barragán-Vite, I. (2018). Production and Maintenance Planning for a Deteriorating System with Operation-Dependent Defectives. Applied Sciences, 8(2), 165.
[13] Singh, B., &Ratha, P. C. (2016). Innovation in Distribution Strategy to Sustain in Competitive Market: A Case Study of Auto Parts Industry. Parikalpana: KIIT Journal of Management, 12(1), 87.
[14] Teplická, K., &Culkova, K. (2011). Kaizen and its applying during cost decreasing in process of production firm maintenance. Annals of the Faculty of Engineering Hunedoara, 9(3), 315.
[15] Natakusumah, M., Hidayatullah, N., &Purba, H. H. (2018). Reducing turnaround time in the laboratory using value stream mapping. International Journal of Recent Engineering Science (IJRES), ISSN: 2349-7157, 5.
[16] Prawira, A., Syahrial, I., &Purba, H. (2017). Application of just-intime manufacturing techniques in radioactive sources in the welllogging industry. Management Science Letters, 7(3), 119-124.
[17] Powell, D. (2013). ERP systems in lean production: new insights from a review of lean and ERP literature. International Journal of Operations & Production Management, 33(11/12), 1490-1510.
[18] Lin, Y., Ma, S., & Zhou, L. (2012). Manufacturing strategies for time-based competitive advantages. Industrial Management & Data Systems, 112(5), 729-747
[19] Li, T., Zhao, X., &Xie, J. (2015). Inventory management for dual sales channels with inventory-level-dependent demand. Journal of the Operational Research Society, 66(3), 488-499.
[20] Buxey, G. (2006). Reconstructing inventory management theory. International Journal of Operations & Production Management, 26(9), 996-1012.
[21] Bajus, R., &Stašová, L. H. (2014). Implementation of the ABC Model in a Company Dealing with Extraction of Raw Materials. Business, Management, and Education, 12(2), 228-244.
[22] Mishra, A., &Lsoni, M. (2012). ABC Analysis Technique Of Material Towards Inventory Management. International Journal of Management Research and Reviews, 2(12), 2092.
[23] Sahin, M., Kizilaslan, R., &Demirel, Ö. F. (2013). Forecasting aviation spare parts demand using Croston based methods and artificial neural networks. Journal of Economic and Social Research, 15(2), 1.
Keywords
ABC Classification, Inventory Management, Pull System, Productivity, Spare Part.