Research Article | Open Access | Download PDF
Volume 13 | Issue 4 | Year 2026 | Article Id. IJRES-V13I4P104 | DOI : https://doi.org/10.14445/23497157/IJRES-V13I4P104Importance of Analytical Hierarchy Process in Contractor Selection and Structural Audit
Snehal Pradeep Wakade, Manisha Jamgade
| Received | Revised | Accepted | Published |
|---|---|---|---|
| 13 Jun 2026 | 21 Jul 2026 | 14 Aug 2026 | 31 Aug 2026 |
Citation :
Snehal Pradeep Wakade, Manisha Jamgade, "Importance of Analytical Hierarchy Process in Contractor Selection and Structural Audit," International Journal of Recent Engineering Science (IJRES), vol. 13, no. 4, pp. 34-38, 2026. Crossref, https://doi.org/10.14445/23497157/IJRES-V13I4P104
Abstract
During the development and maintenance phases of a building, major decisions need to be taken to control its lifecycle. Not methodically inspecting old structures can lead to catastrophic failure, and picking a poor contractor can cause cost overruns and structural flaws. This study presents an integrated Multi-Criteria Decision-Making (MCDM) framework with the use of the Analytical Hierarchy Process (AHP) for two important processes, which are the selection of the building contractor and the evaluation of the priorities of the structural audit. We created two different hierarchical evaluation models. The structural audit model considers building distress signals like carbonation depth, fracture widths & Ultrasonic Pulse Velocity (UPV) variation as priority, while contractor selection model balances the financial bids against qualitative technical & safety indicators. The pairwise comparison matrices obtained from the data of the sector specialists were verified using the Consistency Ratio (CR) limitations. The results indicated the Non-Destructive Testing (NDT) results (42.4%) determine the priorities of structural audits, and the most important element in the selection of contractors is the technical expertise (39.1%). This paradigm of dual-application provides engineers and stakeholders with a rigorous, transparent decision-support system for asset management and structural safety improvement.
Keywords
Analytical Hierarchy Process (AHP), Contractor Selection, Structural Audit, Non-Destructive Testing (NDT), Multi-Criteria Decision-Making (MCDM).
References
[1] Abdul Kareem Abdul Jawwad, and Ibrahim AbuNaffa, “Applying
Analytical Hierarchy Process (AHP) in Selecting Best Maintenance Strategies for
Newly Established Chemical Fertilizers Plants,” Journal of Quality in Maintenance Engineering, vol. 28, no. 3, pp.
545-566, 2022.
[2] Murat Gunduz, Khalid Naji, and Khalid Al-Salahi, “Evaluation
of Critical Success Factors (CSFs) in Selecting Building Contractors through
Pareto and Analytical Hierarchy Process,” Journal of Engineering Research,
vol. 8, no. 4, pp. 1-15, 2020.
[CrossRef] [Google Scholar] [Publisher Link]
[3] Solomon Belay et al., “AHP
based Multi Criteria Decision Analysis of Success Factors to Enhance Decision
Making in Infrastructure Construction Projects,” Cogent Engineering,
vol. 9, no. 1, 2022.
[CrossRef] [Google Scholar] [Publisher Link]
[4] Changsaar Chai, Chia Kuang Lee, and Mervyn Hsin Jyi Wong,
“Analytic Hierarchy Progress (AHP) for Construction Technologies Adoption in
the Malaysian Construction Industry,” Sustainable Construction and Heritage
Conservation in the Digital Age, pp. 113-144, 2026.
[CrossRef] [Google Scholar] [Publisher Link]
[5] Zhen-Song Chen et al., “Expertise-based Bid Evaluation for
Construction-Contractor Selection with Generalized Comparative Linguistic
ELECTRE III,” Automation in Construction, vol. 125, 2021.
[CrossRef] [Google Scholar] [Publisher Link]
[6] Daniel Jato-Espino et al., “A Review of Application of
Multi-Criteria Decision Making Methods in Construction,” Automation in Construction, vo. 45, pp. 151-162, 2014.
[CrossRef] [Google Scholar] [Publisher Link]
[7] Mary Hardie, and Swapan Saha, “Builders' Perceptions of
Lowest Cost Procurement and Its Impact on Quality,” The Australasian Journal of Construction Economics and Building,
vol. 9, no. 1, pp. 1-8, 2009.
[CrossRef] [Publisher Link]
[8] Iman Nurjaman, and Rully Andika Listyantoko, “Analytic
Hierarchy Process for Determination of Decision Making in the Selection of
Contractors,” Jurnal Industry Xplore, vol. 8, no. 1, pp. 1-9,
2023.
[Google Scholar]
[9] Reuben A. Okereke, Dennis Isaac Pepple, and Nneka
Mercyjane Ihekweme, “Assessment of the Major Contractors’ Selection Criteria and Their Impacts
in Civil Engineering Construction Projects,” ITEGAM- Journal of Engineering
and Technology for Industrial Applications (ITEGAM-JETIA), vol. 8, no. 36,
pp. 4-13, 2022.
[CrossRef] [Google Scholar] [Publisher Link]
[10] Alaa Salman, “Selection of Construction Bidders using the
Analytical Hierarchy Process and Friedman Theory,” Frontiers in Built
Environment, vol. 7, pp. 1-11, 2021.
[CrossRef] [Google Scholar] [Publisher Link]